mLCF Projects » Current Projects

Current Projects

The Governing Board prioritized projects for the Measure LCF bond program. Three issuances have been received. Starting in Spring 2018, planning began with an emphasis on safety and security. The initial projects included perimeter fencing standards for all three elementary sites and an overhauled access control and door locking system for the high school. Below is the current list of projects in various levels of planning phases.
La Canada High School
Utility Infrastructure Replacement (Summer 2025 – TBD)
Outdoor Pool Facility & South Campus Improvement (Summer 2021 – Summer 2023)
Guardrails Improvement & Deck Coating Repair (Spring 2022- Summer 2023)
College & Career Center (Summer 2022 – Spring 2023)
Boiler Replacement (Summer 2022 – Winter 2022)
Cooling Tower Replacement (Winter 2022)
Softball Field Backstop & ADA Improvement (Summer 2021)
Perimeter Fencing & Wayfinding (Spring 2020 – Fall 2020)
Cafeteria modernization (Summer 2019)
Band Room & Drainage Improvement (Summer 2019)
New Wellness Center (Summer 2019)
Access Control and Door Locks (Spring 2019)
Field Drainage Repair (Summer 2018)

Palm Crest Elementary
ADA Barrier Removal – Phase 2 (Summer 2023)
Playground Improvement (Summer 2023)
New Two-Story Building & Interim Housing (March 2021 – October 2022)
ADA Barrier Removal & Utility Housing (March 2021 – August 2021)
Site Utilities Replacement (Summer 2020)
Sewer Connection (Summer 2019)
Perimeter Fencing (Summer 2019)
 
Paradise Canyon Elementary
Renovation of Existing Classrooms (TBD Summer 2025)
New Modular Buildings (West) (Summer 2023 – Summer 2025)
Interim Housing (Summer 2023)
Landscaping Improvement (March 2020 – June 2020)
Lunch Shelter Replacement (Summer 2019)
Perimeter Fencing (Summer 2019)
 
La Canada Elementary
Playground Improvement (Summer 2019)
Perimeter Fencing (Summer 2019)